UT· Contractor exam prep + concierge

Utah contractor license prep — the full requirement, in one place.

Every code, exam, and state-specific test the Utah board actually grades you on — paired with the TCS courses that satisfy each one, and the concierge that files your application after you pass. Sourced directly from the issuing boards and verified May 8, 2026.

Utah accepts NASCLA Commercial AND Electrical via Utah Division of Professional Licensing (DOPL). NEC currently tested: NEC 2020. Mandatory pre-licensing 25-hour Utah Construction Trades Education for general contractor (state-specific course; verify scope). Income tax 4.55% flat.

What Utah actually tests

The full requirement set per pathway — what you walk into the exam center expected to know.

UT Electrical Contractor (E100)

Pathway: Electrical Contractor
NASCLA accepted
NEC cycle
NEC 2020
OSHA
OSHA 1926 (referenced)
NEC
Tested
Renewal cycle
Biennial · 16 CE hr
UT EC + Master Electrician 16 hrs CE per biennial cycle (12 hr core code + 4 hr professional) per Utah Admin Code R156-55a.
Signature regime
Wet ink + notary
Fees
Exam $130 + Application $200
State Law
Utah Business and Law
  • 70% passing
State Trade
NASCLA Electrical OR UT EC Trade
  • Ref: NEC 2020
Other codes referenced: NEC (2020)

Reciprocity: UT Master Electrician reciprocity with select states.

UT General Building Contractor (B100)

Pathway: General Contractor
NASCLA accepted
OSHA
OSHA 1926 (referenced)
Renewal cycle
Biennial · 6 CE hr
UT contractor 6 hrs CE per biennial cycle (3 hr core + 3 hr professional) per Utah Admin Code R156-55.
Signature regime
Wet ink + notary
Fees
Exam $130 + Application $200
State Law
Utah Business and Law
  • 50 questions
  • 70% passing
State Trade
NASCLA Commercial OR UT Building Trade Exam
  • 115 questions
  • 70.4% passing

Reciprocity: Pre-licensing 25-hour course required for original Utah license unless waiver applies.

UT Contractor License Application

UT Master Electrician

Pathway: Master Electrician
NASCLA n/a
NEC cycle
NEC 2020
OSHA
OSHA 1926 (referenced)
NEC
Tested
Renewal cycle
Biennial · 16 CE hr
Signature regime
Wet ink + notary
Fees
Exam $90 + Application $75
State Trade
UT Master Electrician Exam (Prov)
  • 70% passing
  • Ref: NEC 2020
Other codes referenced: NEC (2020)

Reciprocity: Reciprocity with select states.

UT Qualifier — entity contractor license

Pathway: Qualifying Agent
NASCLA accepted
NEC cycle
depends
OSHA
OSHA 1926 (referenced)
Renewal cycle
Biennial · 6 CE hr
Signature regime
Wet ink + notary
Fees
Exam $130 + Application $200
State Law
Utah Business and Law
    State Trade
    Trade exam matching classification

      Reciprocity: Qualifier must be employee/owner.

      How TCS covers it

      One row per requirement bucket. Mapped to the TCS course that satisfies it. Honest gap-flagging where a roadmap module isn't shipped yet.

      Required componentTCS courseStatus
      NASCLA Business + Law (accepted)
      TCS NASCLA Business + Law PrepIn build
      Utah Business and Law
      TCS Utah State Law PrepRoadmap
      NEC (NEC 2020) — NFPA 70
      TCS NEC Practice Tests (NEC 2020 routing)Shipped
      OSHA 1926 (referenced)
      TCS OSHA 1926 Construction Safety ModuleRoadmap
      NFPA 70E Electrical Safety (career asset)
      TCS NFPA 70E CourseShipped

      Coverage statuses are pulled from the live TCS product manifest and updated continuously. Roadmap modules ship in-house per the TCS no-outsourced-training policy — no white-label vendor handoffs.

      The Utah bundle

      Pre-launch · Launches 2027-Q1
      Utah contractor prep bundle
      $99

      Covers every required component above — priced at penetration-launch tier (TCS pricing strategy).

      TCS concierge

      We file your UT application after you pass.

      Pass the Utahexams. Sign once. TCS pre-fills the application packet, captures the wet signature where required, mails it certified, and tracks acceptance. Your card arrives in the mail; you don't navigate any board portals.

      Utah business environment — what the exam expects you to know

      State-specific tax / lien / labor / safety facts that show up on the state Business + Law exam and matter for day-one operations.

      Income tax
      4.55%
      Sales tax (state)
      4.85% + 2.2% local avg
      Mechanics lien deadline
      90 days
      Utah Code Title 38 Ch 1a
      Workers' comp threshold
      1+ employees
      Min wage 2026
      $7.25
      federal default
      Right to cancel
      3 days
      Prompt pay
      Utah Code § 13-8-5
      Retainage cap
      5%
      State OSHA plan
      Utah OSH
      Stricter than federal OSHA in some areas

      Reserve a UT seat at the launch price.

      Drop your email and TCS sends a custom plan to your inbox: which exams you actually face, which TCS courses cover each, and what concierge filing covers after you pass.

      We email your plan straight to your inbox. We never share or sell your information. Full TCS plan covers prep, concierge filing, and renewal management end-to-end.

      Sources: dopl.utah.gov/contractor · www.nascla.org/nascla-commercial-exam-participating-state-agencies · dopl.utah.gov/electrician
      Verified May 8, 2026 · Next drift-check due 2026-08-08 · SME-review pending before customer-ship
      Utah General Building Contractor License Exam Prep — TCS | Trade Code Solutions